Change order calculator (benchmark-based)

Compare each line of your change order with typical prices for your ZIP code. Upload the PDF and get a report you can share.

A typical calculator can’t tell you whether a change order is fair, because the answer depends on local labor rates, the trade, site conditions, and how markup is applied.

So instead of asking you to type in numbers, this works from the document itself:

  • Upload the change order as a PDF, spreadsheet, or photo.
  • Check the line items we read, and fix anything that looks off.
  • See which lines are within range, above range, or worth a closer look.

How it works

  • See the local range next to each labor and material line.
  • Find where markup or documentation needs a follow-up.
  • Use the report as a checklist for the conversation with your contractor.

The comparison is informational and based on published benchmarks. It’s not a professional estimate.

Upload a change order for a ZIP-based benchmark preview.